Exploded views for Parts Catalog Mercury/Mariner 3.0 ltr. V6 225 hp 2-stroke [Marathon, SeaPro]
Read more
Read less
Parts Pilot
Anchor Bracket/Throttle Linkage
Reference no. 803196 0
Bleed System (Port)
Reference no. 803196 1
Bleed System (Starboard)
Reference no. 803196 2
Bottom Cowl
Reference no. 803196 3
Carburetor
Reference no. 803196 4
Crankshaft, Pistons And Connecting Rods
Reference no. 803196 5
Cylinder Block And End Cap
Reference no. 803196 6
Driveshaft Housing And Exhaust Tube
Reference no. 803196 7
Dual Engine Extension Kit
Reference no. 803196 8
Electrical Components
Reference no. 803196 9
Exhaust Plate
Reference no. 803196 10
Flywheel/Stator
Reference no. 803196 11
Fuel Lines (Non Oil Injection)
Reference no. 803196 12
Fuel Lines (Oil Injection)
Reference no. 803196 13
Fuel Pump
Reference no. 803196 14
Gear Housing (Driveshaft-Std/Counter-S/N-0G960500 And Up)
Reference no. 803196 15
Gear Housing (Driveshaft-Std/Counter-S/N-0G960499 And Below)
Reference no. 803196 16
Gear Housing (Prop Shaft-C/R-S/N-0G960499 And Below)
Reference no. 803196 18
Gear Housing (Prop Shaft-Std-S/N-0G960499 And Below)
Reference no. 803196 17
Gear Housing (Prop Shaft-C/R-S/N-0G960500 And Up)
Reference no. 803196 19
Gear Housing (Prop Shaft-Std-S/N-0G960500 And Up)
Reference no. 803196 20
Instrumentation
Reference no. 803196 21
Oil Injection Components
Reference no. 803196 22
Components (Removable Pump Housing) Metal Motor Housing
Reference no. 803196 24
Components (Cast Pump Housing) Metal Motor Housing
Reference no. 803196 23
Power Trim Components Plastic Motor Housing
Reference no. 803196 25
Power Trim Motor (Removable Pump Housing)
Reference no. 803196 26
Reed Block/Sound Attenuator
Reference no. 803196 27
Starter Motor
Reference no. 803196 28
Swivel Bracket And Steering Arm
Reference no. 803196 29
Transom Brackets
Reference no. 803196 31
Top Cowl
Reference no. 803196 30